KERRVILLE PUBLIC UTILITY BOARD

Application for the KPUB Critical Load Registry List

"*" indicates required fields

CUSTOMER INFORMATION (please print your information clearly):
to be completed by the customer or customer’s authorized representative. *All information is required unless otherwise indicated.
Service Address:*
I am:*
(select one)
SERVICE LOCATION/SITE INFORMATION
Please select the most applicable category (and subcategory, if applicable) for the service location requesting to be in the critical load registry. Multiple selections are allowed, if needed.
  • Public safety—A customer for whom electric service is considered crucial for the protection or maintenance of public safety, including but not limited to hospitals, police stations, fire stations and critical water and wastewater facilities.
  • Critical infrastructure—A customer that supports natural gas-fired generation, including gas control center or gas compressor plant.
Please select all that apply:**
Describe any existing battery or backup capacity, or dual feed capability:*
(select one)
CUSTOMER SIGNATURE (please type your name in the box below)
I have read and understood the terms and conditions for the KPUB critical load registry. I certify that the information provided on this application is correct and understand it will be used to determine eligibility for the critical load status.
Typed name will constitute customer signature.
TERMS & CONDITIONS

Terms and conditions—Although KPUB provides reliable electric service, there is no guarantee of service. Outages may occur for a variety of reasons, including weather, equipment failure and mandated rotating outages. Critical load customers are still subject to rotating outage events.

Please note that enrollment in our critical load registry does not guarantee an uninterrupted, regular or continuous power supply. Being on the critical load registry list will also not prevent service from being disconnected if your account becomes delinquent. We encourage all of our customers on the critical load registry list to develop an emergency plan in the case of a sustained outage. Your plan should include the use of emergency backup power like a generator.

IMPORTANT INFORMATION

The application must be fully completed in order to obtain a designation of critical load status with KPUB. The application will not be processed and approved if incomplete, unreadable, or improperly submitted. All information is required unless otherwise stated.

What to expect after you apply:
Submission of a critical load registry application does not automatically result in approval and placement in the registry. KPUB representatives will review all applications and contact applications if additional information is needed. Applicants will receive a status email no later than two weeks after they submit their application. Contact us if you have any questions about the registry or your application status. • Phone: 830.257.3050 • Email: [email protected]

This field is for validation purposes and should be left unchanged.